Independence Day 2019

Volunteer Appreciation Dinner

June 3, 2019 Minutes

River Hill Board of Directors

Meeting Minutes

June 3, 2019

 

 

Opening (Agenda 1):

Tony Miceli, Chairperson, called the meeting to order at 7:02 p.m. The following members were in attendance: Dave Dalpe, Matt Levine, and Adam White. Renee DuBois, Council Representative, and Susan Smith, Village Manager, were in attendance. Angela Ling, Board Member, arrived at 7:08 p.m. Harjeet Jandu, Board Member, arrived at 7:14 p.m.

 

Approval of the Agenda (Agenda 2):

Mr. Levine made a motion to approve the agenda as presented. Mr. Dalpe seconded the motion. The motion passed (4-0-0).

 

May 13, 2019 Minutes (Agenda 3A):

Ms. DuBois made a motion to approve the May 13, 2019 Minutes as submitted. Mr. White seconded the motion. The motion passed (4-0-0).

 

Summer Sunrise Drive/River Run Bike Lanes Update (Agenda 4):

Chris Eatough, Bicycle and Pedestrian Coordinator, Howard County Office of Transportation (OOT), and Albert Engel, Bicycle and Pedestrian Planner, OOT provided an update on the project. The bike lanes will be put in as a part of the road-resurfacing project scheduled for late summer or early fall. Mr. Eatough assured the Board that a process to accommodate overflow parking for special events at the River Hill outdoor pool will be provided. OOT is currently coordinating with other county departments to finalize these details. At all times, parking along Summer Sunrise Drive east of Velvet Path will be permitted. There will be no markings on River Run. A diagram showing the proposed bicycle improvements is on file with the original Minutes.

 

Resident Speak Out (Agenda 5):

None.

 

Ruby Tuesday Redevelopment Plan (JPMorgan Chase & Core States Group) (Agenda 6):

Matthew McCool, Vice President, Real Estate Project Manger Senior, Chase Consumer Banking, introduced representatives from Core States Group. They presented plans for the redevelopment of the Ruby Tuesday site. They plan to subdivide the property and either sell or lease the portion with the former restaurant. A copy of the presentation is on file with the original Minutes.

 

Resident Speak Out (Agenda 7):

None.

 

 

New Business (Agenda 8):

None.

 

Board Member Training (Agenda 9A):

Ms. Smith reviewed the training policy and distributed acknowledgement forms for the May and June training for signature.

 

Ad Hoc Playground Committee (10Ai):

Ms. Ling and Ms. Smith will conduct visits to tot lots in the Pointers Run neighborhood that have been suggested for updates and in locations that are central to the neighborhood. The board will need to request funds as part of CA’s FY21/22 budget process.

 

Development Advisory Committee Report (Agenda 10Aii):

None.

 

Teen Advisory Committee (Agenda 10Aiii):

Three (3) students have applied for the Student Member Committee. The committee will interview the students June 17 – 21. The candidates will be interviewed by the full Board at the July 1 meeting. Following appointment of the Student Member(s), the interviews for the Teen Advisory Committee will be conducted.

 

Traffic & Safety Committee (Agenda 10Aiv):

Although the committee has not been active recently, Mr. Miceli noted the Traffic & Safety Committee needs a new chairperson. He mentioned that Jack Guarneri, Bicycle Advocates of Howard County, had met with Erickson Living and shared the concerns regarding the left turn into the site from MD 108.

 

Watershed Committee (Agenda 10Av):

Mr. White reported that 5 large trash bags of invasive plants were removed from the open space during the Pull & Plant event on June 1. The group planted ferns, wild ginger and 4 trees. Eight (8) people participated. The committee is planning to use funds remaining from the Chesapeake Bay Trust grant to install a sign at the rain garden (adjacent to the River Hill Meeting Room). Mr. White noted that there will be no Watershed Palooza in fall 2019. Members of the Board expressed disappointment and Renee DuBois and Harjeet Jandu volunteered to organize the event.

 

Village Manager’s Report (Agenda 10B):

A written report is on file with the original minutes.

 

Board Chair Report (Agenda 10C):

Mr. Miceli asked that the Covenant Advisor contact the condominiums across Great Star Drive and request tree trimming as it is difficult to walk on the sidewalk.

 

Council Representative Report (Agenda 10D):

Ms. DuBois noted that CA is starting the 2-year budget cycle. The CA Board is looking at a variety of options to reduce expenditures, including Haven on the Lake, Fairway Hills Golf Course, and the outdoor pools.

 

Board Speak Out (Agenda 10):

None.

 

Adjournment (Agenda 9):

Mr. Levine made a motion to adjourn the meeting at 9:12 p.m. Ms. Ling seconded the motion. The motion passed (6-0-0).

 

Submitted by: Susan M. Smith, Village Manager

 

Minutes Approved:  July 1, 2019

Plans for Ruby Tuesday Site Progressing

What is happening on the site of the former Ruby Tuesday restaurant? In mid-June social media chatter increased when two RV’s with camping-related gear and a large truck cab were observed parking overnight in the lot for several days. Combined with the minimal maintenance occurring on the property, it is not surprising that residents are concerned the site is becoming an eyesore. After doing some research, the community association discovered the RVs belonged to ID Plans Corp. This company was onsite as part of a detailed assessment of the village center being conducted at the request of Kimco Realty. The truck cab was unrelated. JPMorgan Chase Bank, the new owner of the former Ruby Tuesday site, is aware of the concerns and has indicated they plan to take measures to limit unauthorized access to the property and improve its appearance. Unlike with residential properties, Howard Hughes Corporation (HHC), not the village community association, has the responsibility for enforcing maintenance standards on the commercial properties in the village center. HHC is also aware of the community’s concerns.

Representatives from JPMorgan Chase Bank and Core States Inc., an architectural, engineering and construction firm, pre- sented their initial concept plan for constructing a Chase Bank at the association’s Board of Directors meeting on June 3. Their current plan is to locate the new branch building in the southwestern portion of the site, enabling the property to be resubdivided and the section containing the restaurant building to be sold or leased. At this time, it is unknown whether the restaurant building will be razed or repurposed.

The following process has been identified by the Department of Planning and Zoning (DPZ) to redevelop the site:

  • Pre-Submission Community Meeting.
  • Design Advisory Panel (DAP) Meeting. The Clarksville Pike Streetscape Plan and Design Guidelines will be used in conjunction with review by the DAP.
  • Environmental Concept Plan approval by DPZ.
  • Final Subdivision Plan approval by DPZ for re-subdividing the parcel into two lots. Resubdivisions do not require sketch or preliminary plan approval if no public road improvements are required and there is no additional area being included within the parcel.
  • Site Development Plan approval by DPZ.
  • Planning Board approval. Any adjustments or variances to the Final Development Plan (FDP) criteria is reviewed and approved by the Planning Board.

    In addition to the county process, HHC will also need to review and approve the architectural and landscaping plans. The River Hill Community Association anticipates the Pre-Submission Community Meeting will be held in mid-August. When the date and location become available, the meeting information will be publicized via the association’s various communications tools and signage on the property will be posted.