Shredding Event

Piles of old papers and files piling up? Bring them to Claret Hall for shredding on Saturday, October 15 from 9 a.m. to 1 p.m. Limit of 5 file boxes per household. It is not necessary to remove staples, paper clips, etc. FREE for River Hill residents (must show i.d.) and new this year… non-River Hill residents may also participate for a nominal fee of $5. For more information, call 410-531-1749 or email newsletter@villageofriverhill.org.

Thanks for Stepping Up!

We put out a call for volunteers in July and you heard our cry! We thank the residents who responded to our request for members for the Board of Directors and the Resident Architectural Committee (RAC). We received more applications than openings for the Village Board. River Hill residents Robert Choi and Jason Zagnit have been appointed to the Board to fill the positions. Their terms will end in April 2018. Now that we know residents are willing to serve, we’re aiming for a real election in April 2017—with more candidates than open positions!
So far, 5 residents have contacted Eva Lambright, the Association’s Covenant Advisor to volunteer for the RAC. Over the next two months she will be working with the Architectural Committee and these volunteers to get the RAC up and running. Ideally we’d like to have a full RAC with 7 members. So, if you were contemplating volunteering for the RAC, it’s not too late! Please contact Ms. Lambright at 410-531-1749 or covenants@villageofriverhill.org.
We had an overwhelming response to Jennifer Zhang’s May 2016 article about her experiences as a Student Member of the Village’s Board of Directors and volunteering with the Teen Advisory Committee (TAC). The Association received more than 20 applications for the 9 TAC positions available. Following an extensive interview process, the Board of Directors has appointed the following local youth to the TAC for the next year: Yamini Ananth, Brien Boulle’, Emily Chi, Amber Deng, Tobias Eegholm, Megan Rabe, Cindy Tian, Isabelle Zhan, and Andrew Zhang. We hope that the students who were not appointed will still participate in the Committee’s activities and that we have such an excellent pool of candidates next time.
Thanks to all who stepped up and want to make a difference in our community!

Velvet Path Pond Spillway Replacement and Channel Stabilization Project

The Howard County Department of Public Works will be undertaking a construction project in the community to repair and upgrade the existing stormwater pond and its infrastructure; and to stabilize the associated outfall and stream banks (Project D-1159). This stormwater pond is located near the northeast corner of Summer Sunrise Drive and Velvet Path.

Construction will include:

  1. Installing a construction entrance and access road near the intersection of Velvet Path and Summer Sunrise Drive;
  2. Implementing the approved erosion and sediment control plan;
  3. Excavating the pond to improve water quality treatment;
  4. Installing new sand filter, riser structure, and principal spillway pipe;
  5. Grading of the pond as necessary within the existing limits of the pond;
  6. Stabilizing the outfall structure of the pond and downstream stream; and
  7. Removing sediment controls and re-stabilizing any disturbed areas through vegetative plantings.

The consultant has prepared construction drawings showing the proposed work. Permits are being obtained and construction is anticipated to start Fall 2016. Construction is expected to take approximately eight to ten weeks, weather dependent. During that time the County will try to minimize any inconvenience this may cause the community.

While construction is ongoing, Velvet Path will remain open; however, during construction hours, it may be necessary to temporarily close the walking path from Summer Sunrise Drive that leads to the playground. The path would be reopened after construction ends each day.

If you have any questions about the project or would like to review the current construction drawings, please contact: Michele Monde, Project Manager, DPW – Storm Water Management Division at 410-313-0844 or mmonde@howardcountymd.gov.

MD 32 Signed Bike Route

MC910216967Over the next several months, Howard and Anne Arundel Counties, the MD State Highway Administration and Columbia Association will be installing signs as part of a 15 mile signed bike route from Clarksville to NSA/Fort Meade. The signs will direct cyclists on county and state roads and shared use pathways between Clarksville and the edge of the NSA Campus.

The project will place signs on county, state and CA owned property adjacent to roadways. The signage will direct cyclists by providing turn by turn directions, including the distance, to various destinations along the route. The project will provide a parallel route to MD32 from MD 108 to MD 295, since cycling is not allowed on this segment of MD32.

The map shows the overall scope of the route. The signs are based on standard bike route sign standards and are 30 by 18 inches and will be placed at locations where cyclists will have to change directions, such as an intersection.

For additional information or questions, please contact David Cookson at dcookson@howardcountymd.gov or 410-313-3842.